Successful pullback and installation of the 630mm sleeve, including multiple strategically positioned grout lines, ensuring the ongoing integrity and stability of the Rio Tinto Rail formation. By pumping grout around the exterior of the sleeve, any underground voids or cavities created during installation are effectively filled, eliminating potential settlement issues, maintaining structural support, and safeguarding the rail line for long-term operational reliability.